RWTH Aachen University

Standort

Aachen

Besonderheiten & Herausforderungen

According to the bill of quantities, the following works are carried out:

  • 4.1 – Window units (FE)
  • 4.2 – Doors (T)
  • 4.3 – Sectional doors (ST)
  • 4.4 – Rear-ventilated smooth sheet-metal facades (B)
  • 4.5 – Roof edge cladding as parapet capping (DA)
  • 4.6 – Solar shading systems (So)
  • 4.7 – Louvre facade (L)
  • 4.8 – Facade works – miscellaneous (S)
    • 4.8.1 Built-in components as substructure for the louvre facade, including thermal insulation render
    • 4.8.2 Cleaning