Projekt

Standort
Aachen
Besonderheiten & Herausforderungen
According to the bill of quantities, the following works are carried out:
- 4.1 – Window units (FE)
- 4.2 – Doors (T)
- 4.3 – Sectional doors (ST)
- 4.4 – Rear-ventilated smooth sheet-metal facades (B)
- 4.5 – Roof edge cladding as parapet capping (DA)
- 4.6 – Solar shading systems (So)
- 4.7 – Louvre facade (L)
- 4.8 – Facade works – miscellaneous (S)
- 4.8.1 Built-in components as substructure for the louvre facade, including thermal insulation render
- 4.8.2 Cleaning
